Princes Foods, Chichester

Installation of a new Evapco cooling tower at a site in Chichester. 104mm thin wall metric tube on the return to the cooler and 154mm flow from the cooler connecting into 8 inch sch. 10 manifold. All carried out on the clients shutdown to minimise production downtime.